2026Forging technology / plant engineering

Forging furnace: main axis and installation height

2026 — Setting out the main machine axis and defining the installation height for a forging furnace in the Czech Republic.

Result

The customer was able to keep to an installation schedule that had been calculated very tightly from the outset, and expressed verbal appreciation for the work.

Lasertracker bei der Einmessung im Fundamentbereich, Tschechien 2026
Laser tracker during measurement in the foundation area, Czech Republic 2026
2026Crane runway / plant engineering

Crane runways: verification of rail geometry

2026 — Survey of the rails of four crane runways in a newly built industrial assembly hall. The aim was to verify that the rail geometry lies within the legally prescribed tolerances and that crane operation can commence.

Result

All surveyed crane runways were within the prescribed tolerance. The cranes could therefore be put into operation immediately.

Vermessung der Kranbahnschienen in der neuen Montagehalle, 2026
Surveying the crane runway rails in the new assembly hall, 2026
2024Accelerator technology / medical

Synchrotron for cancer therapy

2024 — Verification measurements, alignment and positioning of high-vacuum tubes, magnets and injectors of a synchrotron used for medical treatment.

  • On-site assignment as surveying engineer
  • Highest demands on positional accuracy and verification
Lasertracker im Synchrotronring, 2024
Laser tracker inside the synchrotron ring, 2024
Individual projects

Precision surveying of production and belt lines

Assignments with 3D laser trackers (Leica, FARO) in Europe as well as North and South America — each with the specific task on site.

Einetagenpresse in Trujillo, Peru
Trujillo, Peru · 2012 · Single opening press

Belt drums and press table before the belt change

Task

Inspection of the machine, preparation of a measurement grid, check of drum abrasion (deformation) and cylindricity, alignment of the belt drums and check of the press table position — all in preparation for the installation of a new belt.

Result

The belt installation was successful and the new belt ran smoothly right from the start.

Bandförderer mit Ofen und Lenkrollensystem, Monterrey
Monterrey, Mexico · 2012 · Single belt conveyor with oven

Belt steering of an oven conveyor, bakery industry

Task

Initial situation: the belt steering roller was already at maximum deflection and still could not prevent the belt from running off. Assistance with the reinstallation of the belt steering roller system in a different position.

Result

Relocating the steering roller increased the effectiveness of the belt control dramatically. The belt has been tracking reliably ever since, the alarms caused by maximum roller tilt stopped and production was able to start.

Einetagenpresse in Nazaré, Portugal
Nazaré, Portugal · 2014 and 2021 · Single opening press

Realignment after a fire in the plant

Task

Realignment of the rebuilt machine after two separate fires in the plant — two assignments in 2014 and 2021, each before the installation of a new belt.

Result

After the first alignment the machine went straight into production, with very satisfactory belt tracking from the start. Following the second fire the customer therefore requested the same measurement assignment again, which was carried out to their complete satisfaction.

Messaufnahme von Bandtrommeln und Presstisch in der Auswertesoftware
Cavezzo, Italy · 2014 · Single opening press

Alignment before the first belt installation

Task

Alignment of the machinery before the installation of the first belt.

Result

The plant’s chief engineer explicitly commended the accuracy of the alignment. The belt installation went without problems and the belt tracked correctly straight away.

Antriebseinheiten einer Doppelbandpresse, São Paio de Oleiros
São Paio de Oleiros, Portugal · 2017 · Double belt press

First installation of a double belt press

Task

Positioning and alignment of a brand-new double belt press system as part of the first installation, including the belt rollers.

Result

The precise alignment of machine components and belt rollers shortened the run-in time of the press and enabled production to start on schedule.

Doppelbandpresse mit Lasertracker im Messeinsatz, Ungarn
Hungary · 2022 · Double belt press

Alignment before the installation of new belts

Task

Alignment and positioning of the double belt press system before the installation of new belts, aimed at minimising the alignment differences between the upper and lower belt.

Result

After the survey the control movements needed to correct belt tracking were considerably smaller and no longer triggered maximum belt travel alarms — a result the customer was expressly satisfied with, as production could be resumed without unplanned downtime.

Some of the projects listed were carried out in previous employment or on behalf of third parties. Client names are stated only where permissible. Further details on individual projects on request.

A comparable task?

If your plant shows similar behaviour, a few details are usually enough to derive which measurement will bring clarity.